https://www2.illinois.gov/cdb/procureme ... sults.aspx
Bid results are on this page, River City was low at 103 million, luckily there were 3 bidders this time. Only having 1 bidder caused the issues previously when the bid was over budget. State tends to be more likely to award over budget projects where there is multiple bidders having 3 should assist in pushing it through hopefully. I feel like if I remember right when this bid the 1st time it was in the 80 million range and the whole building was bigger, that just shows how much the construction market has gone up especially in last couple years.
Performing Arts Center
Good.golly.WIU0812 wrote: ↑Mon May 16, 2022 8:54 pm https://www2.illinois.gov/cdb/procureme ... sults.aspx
Bid results are on this page, River City was low at 103 million, luckily there were 3 bidders this time. Only having 1 bidder caused the issues previously when the bid was over budget. State tends to be more likely to award over budget projects where there is multiple bidders having 3 should assist in pushing it through hopefully. I feel like if I remember right when this bid the 1st time it was in the 80 million range and the whole building was bigger, that just shows how much the construction market has gone up especially in last couple years.
thank you for that site, also. I’m used to scanning the IDOT letting bulletins. Always wondered where projects like this are let.
#ALLIN #YOLO
IDOT is pretty much strictly roads and bridges. There is also a bid that happened at same time for replacement of a chiller and a chilled water loop at WIU. Unfortunately that only got 1 bid from Laverdiere for 8.8 million, hopefully it wasn't over budget.
- Neckfansince71
- Posts: 1181
- Joined: Sat Apr 19, 2014 7:06 pm
I just gotta shake my head in total amazement as we are forced to build a building during what has become tougher financial times. I don't really see a political downside to awarding it which as we know will really give west central illinois a financial boost. This is a part of Pritzker's infrastructure plan. Let's hope he honors his commitment. I wonder if there is another building project that has been put through the "ringer" this many times. ;)jc
- sealhall74
- Posts: 5790
- Joined: Fri Apr 18, 2014 1:18 pm
- Location: Wherever, Windblows
In an election year, do you bring a lot of public attention to any controversial public construction projects (failed, postponed, or otherwise)? My bet would be NO. More delays coming, maybe even a protest after award.Neckfansince71 wrote: ↑Wed May 18, 2022 7:38 am I just gotta shake my head in total amazement as we are forced to build a building during what has become tougher financial times. I don't really see a political downside to awarding it which as we know will really give west central illinois a financial boost. This is a part of Pritzker's infrastructure plan. Let's hope he honors his commitment. I wonder if there is another building project that has been put through the "ringer" this many times. ;)jc
Embrace the pace of the race.
- Neckfansince71
- Posts: 1181
- Joined: Sat Apr 19, 2014 7:06 pm
The fact that we are closing in on an election makes this that important to Pritzker. Why would he not want to be seen as a "promise keeper!"
jc
jc
- sealhall74
- Posts: 5790
- Joined: Fri Apr 18, 2014 1:18 pm
- Location: Wherever, Windblows
Because the tax dollars are being spent in Forgottonia and not close to Lake Michigan where the majority of voters are.Neckfansince71 wrote: ↑Wed May 18, 2022 8:44 am The fact that we are closing in on an election makes this that important to Pritzker. Why would he not want to be seen as a "promise keeper!"
jc
Embrace the pace of the race.
I have been keeping my eye on this and haven't seen anything definitive on it yet, I did hear a rumor late last week that it was going to be a go, but just a rumor so far not sure it has any merit. I did see the 10 million dollar chilled water project was awarded so any time you see a 10 million investment its a good thing even if not directly noticeable. Not totally sure what all that project encompasses just says chiller and chilled water loop.